Jaira plant
Spain
Water distribution
Prior situation
Gradual substitution of the pumps of the Jaira pumping station – CCRR El Porvenir (altitude water transfer Tagus-Segura).
Caprari solution
No.1 system with high flow rate vertical pump
Equipped with B5 4P 850 HP 1800 m³/h motor at 100 mWc
Benefits obtained
The equipment is currently operating 3% above its working point, without vibrations and with correct temperature levels on bearings and coils. It is operating and has an energy consumption 2% below the motor nominal value.
After installing the pump, higher energy efficiency and the pump’s superior hydraulic performance have been observed; thus the owners have already recovered all of the money they invested in the installation.